Integration Layer
External connection readiness
CRM, paid ads, messaging, analytics and infrastructure connections that must be live before campaign launch and external writes are permitted by the MCP layer.
1 critical blocker
Total integrations
7
Connected
2
Critical blockers
1
Warnings
5
Critical — must resolve before launch
system · critical
Please fix Meta billing
Meta launch is blocked until billing and ad account access are confirmed.
Warnings — resolve before stable operations
system · high
Resolve freeholdproperties.ae DNS
system · high
Connect HubSpot CRM
system · high
Configure tracking pixels and conversion events
system · medium
Connect Google Ads account
system · medium
Connect WhatsApp Business lead flow
Integration status by category
Paid Ads
Paid Ads
Google Ads
Google search and display — budget and bidding control
Never synced
Paid Ads
Meta Ads
Meta and Instagram campaign management, pixel events
Never synced
crm
crm
HubSpot CRM
Never synced
database
database
Neon Database
Never synced
deployment
deployment
Vercel Production
Never synced
messaging
messaging
WhatsApp Business
Never synced
tracking
tracking
Tracking / Pixels / Forms
Never synced